BR18 § 295 requires building automation in buildings with a design heating or cooling demand above 290 kW, and § 296 requires functional testing before the building is taken into use. The EU buildings directive (EPBD 2024) sets the threshold at 70 kW by 31 December 2029 at the latest. A consultation draft of BR18 introduces 70 kW from 1 January 2030, but as of 5 November 2026 the draft has not been issued: Retsinformation shows BEK nr. 1485 of 1 December 2025 as the latest amendment to BR18, and bygningsreglementet.dk shows 290 kW.
BR18 as it currently stands
- Section 295, paragraph 1: new buildings covered by § 260 with a design heating or cooling demand above 290 kW must have building automation for controlling the technical systems.
- Section 295, paragraph 2: the same limit for existing buildings, if it is technically feasible and cost-effective, cf. § 275. The installation should be completed by the end of 2025.
- Section 295, paragraph 3: the system must be able to continuously monitor and analyse energy consumption, communicate with and regulate the technical systems energy-efficiently according to demand, express the energy efficiency of the building and the systems, and detect faults and notify operating staff.
- § 296: functional testing before the building is taken into use. It must demonstrate correct installation and adjustment, that the automation works as intended, and that it gives the building the intended energy efficiency.
Functional testing is also required for lighting (§ 384), heating and cooling systems (§ 391) and ventilation (§ 450).
EPBD 2024: Articles 13 and 23
| Provision | Contents | Date |
|---|---|---|
| Art. 13(9) | Building automation in non-residential buildings, where technically and economically feasible: heating systems, air-conditioning systems and combined systems with ventilation, effective rated output above 290 kW | By 31 December 2024 |
| Art. 13(9) | Same requirement over 70 kW | By 31 December 2029 |
| Art. 13(10)(d) | The system must monitor the quality of the indoor environment | By 29 May 2026 |
| Art. 13(12) | Automatic lighting control with appropriate zoning and presence detection, above 290 kW, where technically and economically feasible | By 31 December 2027 |
| Art. 13(12) | Same requirement over 70 kW | By 31 December 2029 |
| Art. 13(11) | New residential buildings and major renovations, if technically, economically and functionally feasible: electronic monitoring, control functions and response to external signals | From 29 May 2026 |
In addition to the indoor climate, the system must under paragraph 10 continuously monitor, record, analyse and allow adjustment of energy consumption, benchmark energy efficiency, detect efficiency losses and notify the person responsible for operation, and communicate and be interoperable across technologies, equipment and manufacturers.
- Art. 13(5): new zero-emission non-residential buildings must have measuring and control devices for indoor air quality. Existing non-residential buildings at major renovation, where technically and economically feasible.
- Art. 13(6): when a technical building system is installed, the overall energy performance of the altered part and, where relevant, of the entire altered system is assessed. The result is documented and passed on to the building owner.
- Art. 23(7): buildings that meet Art. 13(10) or (11) are exempt from the inspections in Art. 23(1).
- Art. 23(8): Member States introduce inspection schemes or alternative measures, e.g. digital tools and checklists, certifying that the work carried out meets the intended energy performance and the minimum requirements.
The directive binds the Member States. For the client, the requirements apply once they are implemented in Danish law.
The consultation draft of BR18
The consultation (case 71068 on Høringsportalen, deadline 17 March 2026, planned entry into force 29 May 2026) proposes that § 295(1) and (2) apply from 1 January 2030 to non-residential buildings with a design heating or cooling demand above 70 kW, new and existing, where technically feasible and cost-effective. Already from 29 May 2026 the draft’s subsection 3 was intended to be extended with monitoring of indoor climate quality. The draft also changes the term to building automation and control system, adds a subsection 4 on zero-emission buildings (response to external signals) and a new § 295a for new residential buildings. It is a draft, so do not use its wording in a project until the final order has been seen on Retsinformation.
Differences that are worth keeping track of
- BR18 uses the design heating or cooling demand. EPBD uses the system’s effective rated output. The two figures are not the same measure.
- Indoor climate monitoring is included in the EPBD, but not in the applicable § 295, paragraph 3.
- Automatic lighting control is in the EPBD, Art. 13(12), but not in the current § 295.
Where the functions are found in the LOYTEC system
| EPBD, Art. 13(10) | Example in the LOYTEC system |
|---|---|
| a) Monitor, record, analyse | Trend log and alarm in every unit (L-ROC, L-INX, L-DALI) |
| b) Benchmark, detect losses, notify | LWEB-900 reports on trend logs and alarm thresholds |
| c) Communicate, interoperability | BACnet (B-BC, BTL), OPC UA, Modbus, KNX, LON, M-Bus |
| d) Monitor indoor climate | Temperature, humidity, light and presence in LDALI-MS3-BT, CO2 in LSTAT-802 |
Whether a project meets the requirements is decided during the design and functional testing phases. The words in the tender documents are on the page about CTS, IBI and BMS. See also the article about BACS in the tender.
Sources: BR18 §§ 295-296, §§ 384, 391 and 450. Directive (EU) 2024/1275, Articles 13 and 23. Consultation 71068, Appendix 1. BEK nr. 1399 of 12 December 2019 with later amendments. Accessed 5 November 2026. This page is not legal advice. In the event of a discrepancy, the text of the law applies.