{"id":9886,"date":"2026-11-06T09:16:33","date_gmt":"2026-11-06T08:16:33","guid":{"rendered":"https:\/\/www.arinn.dk\/cts-ibi-bms-ordforklaring\/"},"modified":"2026-11-23T15:40:20","modified_gmt":"2026-11-23T14:40:20","slug":"cts-ibi-bms-glossary","status":"publish","type":"page","link":"https:\/\/www.arinn.dk\/en\/cts-ibi-bms-ordforklaring\/","title":{"rendered":"What is a CTS system? CTS, IBI and BMS explained"},"content":{"rendered":"<p class=\"article-ingress wp-block-paragraph\">A CTS system (Central Tilstandskontrol og Styring, the Danish term for a central control and monitoring system) is a computer-based system that controls, regulates and monitors a building\u2019s technical installations, such as heating, ventilation, water and electricity. The term is typically used for the automation of plant in plant rooms and on the roof. IBI is the automation in the occupied areas, and BMS is the system as a whole. The definitions follow DTU\u2019s BMS Basisbeskrivelse (base specification) and the description of services for BMS from Bygningsstyrelsen (the Danish Building and Property Agency).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">When is CTS a requirement?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">BR18 section 295 requires building automation in new buildings with a design heating or cooling demand above 290 kW, and section 296 requires functional testing before the building is taken into use. The thresholds and the EU\u2019s 70 kW are covered on the page about <a href=\"\/en\/building-automation-requirements-br18-epbd\/\">building automation requirements in BR18 and the EPBD<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What a CTS system has to do<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">DTU\u2019s BMS Basisbeskrivelse is based on bips B2.460, the base specification for building automation, with DTU\u2019s own additions and omissions. Section 1.3 states the purpose: to control and regulate the technical installations with the lowest possible energy consumption and the greatest possible regard for thermal comfort, and to document that the other installations are free of faults, or to find the faults in them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Control is decentralised. Each outstation controls and regulates its own plant independently and must be able to carry on without a connection to the main station or other outstations, using the setpoints and corrections it last received. The main station is the supervisory layer for operation. All devices follow a common annual calendar with holidays, Sundays and public holidays for time schedules, and DTU requires automatic switching between summer and winter time and synchronised clocks. DTU also requires that logs are created in the outstations as BACnet trend logs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What a CTS system consists of<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><b>Main station (hovedcentral, HC):<\/b> the supervisory layer from which outstations and subsystems are operated.<\/li>\n\n\n\n<li><b>Outstations (undercentraler, UC):<\/b> independent, programmable control and regulation units with their own CPU and memory. The base specification requires that the automation can be operated without a connection to the main station, and that the data points in a single control loop sit on the same outstation. The control panel must have room for an expansion of 20% of the connected point count, and there must be at least 20% spare capacity of every type of software.<\/li>\n\n\n\n<li><b>Automation components:<\/b> sensors for temperature, differential pressure, humidity, light and CO2 or air quality, PIR sensors, motorised valves and damper actuators.<\/li>\n\n\n\n<li><b>Network:<\/b> DTU requires BACnet\/IP at backbone level. Within the individual building, any protocol based on an open, international ISO standard may be used, provided it is converted to BACnet\/IP. Proprietary protocols may not be used, apart from the internal bus between I\/O modules and their controller.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Example: the requirements applied to a ventilation system<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The base specification\u2019s requirements applied to a ventilation system: The fan run indication (airflow switch) reports operation via a normally open contact. The outstation raises an alarm, after a suitable time delay, if the plant does not report running when it starts, or reports running while stopped. Alarm inputs are wired as normally closed contacts, so that a cable break or a poor connection also raises an alarm. All closed control loops, on a ventilation system for example temperature and pressure, must be loop-tuned: P, I and D are adjusted so that the loop is neither unstable nor overdamped.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Testing and handover<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">First, point testing: each point is tested from the component out in the plant to the graphic on screen, through cables, control panel, outstation, network, main station and database, and documented point by point. Then functional testing with all programs and parameters loaded, as soon as pumps and fans may be started. Loop tuning is done in at least two rounds: the first at commissioning, on empirical values if water and air have not been balanced, and the second after balancing. It is carried out as a step response test.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At DTU, a project is not handed over until point testing, functional testing and loop tuning have been carried out and documented all the way to the main station.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What does a CTS system cost?<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">ARINN does not quote project prices. What drives the price in a specification like DTU\u2019s is:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>the number of data points (I\/O) and outstations, plus 20% spare space in the control panel and 20% spare software capacity<\/li>\n\n\n\n<li>plant graphics, alarms and logs on the main station, and operator licences<\/li>\n\n\n\n<li>the application programs for the specific building project<\/li>\n\n\n\n<li>point testing point by point, functional testing and loop tuning of all loops, for shared cooling and heating plants twice, at 25% and 90% load<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">ARINN sells the LOYTEC components through Competence Partners. If you do not have a trained technician of your own, ARINN will find a Competence Partner for programming and commissioning. ARINN supports the partner with technical backup and access to LOYTEC. <a href=\"\/en\/contact\/\">Contact ARINN<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">CTS programming<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The base specification requires that the application program in the outstation is created in a graphical programming tool and assembled from predefined function blocks. DTU adds a requirement for Codesys when a PLC is used as an outstation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">LOYTEC's L-INX Automation Servers are available in configurable versions, such as the LINX-202 (tool: L-INX Configurator), and programmable versions, such as the LINX-215, which are programmed in L-STUDIO, based on IEC 61131-3 and IEC 61499, and configured in L-INX Configurator. It is the programmable version that corresponds to the base specification\u2019s outstation.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">CTS, IBI and BMS: definitions<\/h2>\n\n\n\n<div class=\"arinn-tabel\" style=\"overflow-x:auto\"><table>\n<tr><th>Term<\/th><th>Meaning in DTU\u2019s BMS Basisbeskrivelse (2017)<\/th><\/tr>\n<tr><td>CTS (Central Tilstandskontrol og Styring \u2013 central monitoring and control)<\/td><td>Computer-based control system for the control, regulation and monitoring of building services, e.g. water, heating, ventilation and electrical. Typically used for the automation of the technical plant in plant rooms or on the roof that serves larger areas of the building.<\/td><\/tr>\n<tr><td>IBI (Intelligente bygningsinstallationer \u2013 intelligent building installations)<\/td><td>The automation in the building\u2019s occupied areas, which can control e.g. lighting, heating, ventilation, cooling, solar shading and blackout. Typically divided into zones for cellular offices and meeting rooms, open-plan areas, ancillary rooms, corridors and stairs. Can be bus-based and can be connected to a CTS system.<\/td><\/tr>\n<tr><td>BMS (Building Management System)<\/td><td>The total CTS and IBI system. It can also include other systems, such as security systems, where the BMS is used as a unified control system.<\/td><\/tr>\n<tr><td>HC (hovedcentral \u2013 head-end)<\/td><td>The top level of the CTS system for operating subsystems and undercentraler (outstations).<\/td><\/tr>\n<tr><td>UC (undercentral \u2013 outstation)<\/td><td>Independent programmable control and regulating units for controlling and regulating automated processes. The term is most commonly used in building automation.<\/td><\/tr>\n<tr><td>SCADA<\/td><td>Freely configurable user interface and operator system for automation and monitoring tasks. The base specification calls it industry\u2019s counterpart to a CTS main station.<\/td><\/tr>\n<\/table><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Bygningsstyrelsen\u2019s service specification \u201dProjekteringsydelser BMS\u201d (2019) uses BMS in the same way and mentions rumautomatik (room automation) separately: BMS comprises CTS, IBI and rumautomatik for offices, meeting rooms, teaching rooms, common rooms, laboratories and animal facilities.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Other words in the tender documents<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><b>Gr\u00e6nsefladeskema (interface schedule):<\/b> shows the interfaces between the BMS and the project\u2019s other trades: who supplies, installs, commissions and balances. Also shows whether e.g. fire and smoke dampers and solar shading are part of the BMS (Bygningsstyrelsen).<\/li>\n\n\n\n<li><b>Systemkonfiguration (system configuration):<\/b> shows the head-end, undercentraler (outstations), IBI and other hardware (Bygningsstyrelsen).<\/li>\n\n\n\n<li><b>Betjeningspanel (operator panel):<\/b> must, at Bygningsstyrelsen, be modelled into room layout drawings, ceiling plans and elevations.<\/li>\n\n\n\n<li><b>Punkt- og funktionsafpr\u00f8vninger, indregulering og performance test (point and functional tests, balancing and performance test):<\/b> Bygningsstyrelsen\u2019s phases at the end of the project.<\/li>\n\n\n\n<li><b>Funktionsafpr\u00f8vning (functional test):<\/b> the word in <a href=\"\/en\/building-automation-requirements-br18-epbd\/\">BR18 \u00a7 296<\/a> (building automation), \u00a7 384 (lighting), \u00a7 391 (heating and cooling) and \u00a7 450 (ventilation).<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">The Norwegian and Swedish words<\/h2>\n\n\n\n<div class=\"arinn-tabel\" style=\"overflow-x:auto\"><table>\n<tr><th>Danish<\/th><th>Norwegian<\/th><th>Swedish<\/th><\/tr>\n<tr><td>CTS-anl\u00e6g (CTS system)<\/td><td>SD-anlegg<\/td><td>\u00f6verordnat system (\u00d6S)<\/td><\/tr>\n<tr><td>Rumcontroller (room controller)<\/td><td>romkontroller<\/td><td>rumsregulator<\/td><\/tr>\n<tr><td>Undercentral (outstation)<\/td><td>undersentral<\/td><td>DUC<\/td><\/tr>\n<\/table><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The words have been seen in Norwegian and Swedish requirement specifications and product catalogues.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The LOYTEC products in that breakdown<\/h2>\n\n\n\n<div class=\"arinn-tabel\" style=\"overflow-x:auto\"><table>\n<tr><th>Level<\/th><th>Products<\/th><\/tr>\n<tr><td>IBI and room automation<\/td><td>L-ROC (LROC-40x, LROC-800), LPAD-7, L-DALI controllers and multisensors, LOYBT Bluetooth Mesh<\/td><\/tr>\n<tr><td>CTS and undercentraler (outstations)<\/td><td>L-INX, L-IOB<\/td><\/tr>\n<tr><td>Gateways<\/td><td>L-GATE<\/td><\/tr>\n<tr><td>Head office<\/td><td>LWEB-900<\/td><\/tr>\n<tr><td>Local operation and visualisation<\/td><td>L-VIS<\/td><\/tr>\n<\/table><\/div>\n\n\n\n<p class=\"kilde wp-block-paragraph\"><b>Sources:<\/b> <a href=\"https:\/\/dtu.dk\/om-dtu\/kontakt-og-besoeg\/for-leverandoerer\/dtu_standarder\/dtu-standarder-lyngby\/460-bygningsautomation\" target=\"_blank\" rel=\"noopener\">DTU BMS Basisbeskrivelse for bygningsautomation<\/a>, 21-08-2017: the introduction, sections 1.2 (definitions), 1.3 (the purpose of CTS), 3.5.2 (BMS system), 3.5.3 (network), 3.5.4 (CTS outstations), 3.5.6 (automation components) and 3.6.11 (testing). The base specification is based on bips B2.460; where the text says \u201cDTU requires\u201d, it is DTU\u2019s own addition or amendment. Bygningsstyrelsen (the Danish Building and Property Agency): Fagspecifik ydelsesbeskrivelse, Projekteringsydelser BMS (discipline-specific description of services, BMS design services), 01-08-2019, ref. no. 18\/0105. BR18 sections 295, 296, 384, 391 and 450. Data sheets LINX-202\/203 and LINX-215. The ventilation example is ARINN\u2019s compilation of the base specification\u2019s requirements, and the same applies to the placement of the products. Last reviewed 23-11-2026.<\/p>","protected":false},"excerpt":{"rendered":"<p>Et CTS-anl\u00e6g (Central Tilstandskontrol og Styring) er et computerbaseret system, der styrer, regulerer og overv\u00e5ger bygningens tekniske installationer, fx varme, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"content-type":"","_oct_exclude_from_cache":false,"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-9886","page","type-page","status-publish","hentry"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"Kirkgaard","author_link":"https:\/\/www.arinn.dk\/en\/author\/kirkgaard\/"},"uagb_comment_info":0,"uagb_excerpt":"Et CTS-anl\u00e6g (Central Tilstandskontrol og Styring) er et computerbaseret system, der styrer, regulerer og overv\u00e5ger bygningens tekniske installationer, fx varme, [&hellip;]","_links":{"self":[{"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/pages\/9886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/comments?post=9886"}],"version-history":[{"count":1,"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/pages\/9886\/revisions"}],"predecessor-version":[{"id":9908,"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/pages\/9886\/revisions\/9908"}],"wp:attachment":[{"href":"https:\/\/www.arinn.dk\/en\/wp-json\/wp\/v2\/media?parent=9886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}